To the central content area

The Keelung River basin management in 2002

Absrtact
This project has achieved the following outcomes.1. the listing of 38 operation records of wastewater apparatus2. the 95 times of sampling of wastewater emission.3. the inspections of 157 times of sludge.4. the inspection of building site and runoff from excavation site once a month.5. the inspection of 60 times of pollution behaviors in water resources sanctuary. 6. the inspection of 323 times of general, claim and accidental if water pollution.
Keyword
Inspection of pollution behaviors,Keelung River investigation,accidental blind oil spill,industrial wastewater
Open
top